Revamping of the aboveground installations (AGI) of the underground gas storage site of Saint Illiers. This includes basic engineering, safety studies, preparation of tender documents and files for permitting, follow-up of contractors up to commissioning of revamped installations.
Feasibility study of the revamping of the gas wellheads of the underground gas storage station at Saint-Illiers.
2006 - 2012
France
Sines LNG terminal extension
FEED and ITB package, Assistance to selection of EPC Contractor and Owner's Engineer assignment during EPC Contract (detailed design and site supervision).
2008 - 2011
Portugal
Dahej Vijaipur pipeline upgrade (DVPL II project)
Full PMC (project management consultancy) for a new 600 km and 48" gas pipeline.
2008 - 2011
India
Mundra LNG terminal
Site selection, detailed feasibility study, pre-FEED studies and FEED.
2008 - 2010
India
Gioia Tauro - Medgas LNG terminal
Pre-FEED phase with conceptual design and cost estimate at ± 25 %. Front End Engineering and Design (FEED) with cost estimate at ± 10 %. Specification of EPC scope and procedures and ITT package.
The assignment covers the whole terminal except pipe-in-pipe cryogenic lines.
2008 - 2010
Italy
Mejillones LNG terminal (Norte Grande Chili)
FEED study and Owner's Engineering services for a new LNG import terminal in Northern Chile.
The project consists in a on-shore vaporization system with a ship used as floating storage (=fast track solution) and in a classic LNG tank and ancillaries (=long term solution).
2006 - 2010
Chile
Underground gas storage at Chemery
Feasibility study for complete revamping at Chemery Principal underground gas storage facilities.
2009 - 2010
France
Underground gas storage at Gournay
Replacement of a TEG regeneration unit of the underground gas storage at Gournay. Feasibility study followed by basic engineering, procurement activities, construction and start-up of the new installations.
2008 - 2010
France
Extension du terminal GNL
Mission d’«owner’s engineer» comprenant la gestion du contrat et le suivi de toutes les activités de conception et de construction pour l’extension du terminal GNL de Fluxys à Zeebrugge, avec un 4e réservoir de stockage de GNL (capacité de 140 000 m³) et les installations supplémentaires pour la regazéification et l’acheminement du gaz dans le réseau de transport.
2005 - 2009
Belgium
Triton LNG FSRU
Assistance to Owner for project management and FEED supervision.
2008 - 2009
Italy
Trinidad liquefaction terminal
Expertise and Owner's Engineering assignments for LNG tank overhaul.
2009 - 2009
Trinidad and Tobago
Fos Tonkin LNG terminal
Feasibility study of the fourth tank.
Terminal overall renovation strategic study (feasibility stage).
2008 - 2009
France
Hazira LNG terminal debottlenecking
Assistance to Owner for terminal expansion studies - Framework agreement for Design and Engineering.
2007 - 2009
India
LNG terminal in Antifer- Le Havre
Full Owner's Engineer assignment covering: Pre-FEED review and optimisation of regasification system, Assistance to Public Debate, study of various technical solutions (GBS, reclaimed area,…), complete FEED.
2007 - 2009
France
Porto Empedocle LNG terminal
FEED for a new 8 bcm/a LNG terminal, including shipping study, marine access and operation, optimisation studies and simulation reports, EPC bid packing, EPC cost and schedule estimations, seismic study.
Owner's Engineering for clarification to tenderers and EPC contractor selection.
2006 - 2009
Italy
Priolo Gargallo LNG terminal - Sicily
Pre-FEED and FEED for a new receiving LNG terminal in Sicily including conceptual assessment and validation of pre-FEED definition, Front End Engineering and Design (FEED), specification of EPC scope and procedures.
2006 - 2009
Italy
Revamping of Winksele compression station
FEED for the extension of the Winksele compression station including the replacement of three compressors (gas turbine driven system) with electrical driven compressors and the installation of 4 new electrical driven compressors. Following activities have been performed: project management, HSE, process engineering, civil and structural engineering, piping & lay out study, electrical and I&C engineering and cost estimation.
2009 - 2009
Belgium
Libyan gas network
FEED study and tender package for 4 main gas transmission pipelines.
FEED study and tender package for the development of gas distribution networks in the region of the Western Mountain (West of Tripoli) and in the region of the Green Mountain (Near Benghazi).
2008 - 2009
Libyan Arab Jamahiriya
Gas master plan & city gas distribution
Gas master plan for the gas transmission network and city gas distribution in major Libyan cities.
2007 - 2009
Libyan Arab Jamahiriya
LNG terminal extension at Zeebrugge
Feasibility study of increase of send out capacity of the terminal.
Technical feasibility of the installation of the two open rack vaporizers.
Pre-feasibility of a second extension with new jetty, new tanks and vaporisation.
2008 - 2008
Belgium
Mejillones North Chile LNG terminal
Delivery of design of BOG (Boil-off Gas) recondenser for EPC contractor.
2008 - 2008
Chile
Verdon gas pipeline
New LNG import terminal on the site of Le Verdon, North of Bordeaux.
Feasibility study to connect the terminal to the high pressure gas transportation network.
2008 - 2008
France
Feasibility study of a gas pipeline in Corsica
Feasibility study for connecting the Corsica island to the GALSI pipeline linking Algeria to Italy via Sardinia.
2008 - 2008
France
Underground gas storage at Tirgu Mures
Feasibility study for the development of new underground storage facilities at Tirgu Mures.
2008 - 2008
Romania
Barbaira compression station
Feasibility study for the performance improvement of a compression station.
2008 - 2008
France
Extension of the Berneau compression station
FEED for the extension of the Berneau compression station including the replacement of two compressors (gas turbine driven system) with electrical driven compressors and the installation of 3 new electrical driven compressors.
2008 - 2008
Belgium
Jordan gas transmission pipeline
Technical advisor to Jordan Authorities for the implementation of the Jordan gas transmission pipeline (36" - 392 km), as part of the Arab gas connector linking Egypt to Jordan, Syria, Lebanon and ultimately Turkey.
2004 - 2008
Jordan
Upgrading of Taisnières interconnection station
Feasibility study for the upgrade of the interconnection station of Taisnières-sur-Hon located at the French Belgian border.
2007 - 2007
France
Cabrillo Port LNG FSRU
Technical assistance for the development of a FSRU (Floating Storage and Regasification Unit) LNG terminal in Port Cabrillo.
2006 - 2006
United States of America
Mugardos LNG Terminal at La Coruña
Complete EPC turnkey project including Authority Engineering for a 5.2 bcm/y import terminal, with unloading jetty, 2 LNG storage tanks of 150.000 m³, a LNG truck loading station and natural gas distribution system to the local grid at 80 barg.
2003 - 2006
Spain
Snøhvit LNG liquefaction terminal
Complete mission for engineering, procurement, construction and commissioning of a loading jetty, 2 LNG storage tanks (2 x 125,000 m³), 1 LPG storage tank (45,000 m³), 1 condensate storage tank (75,000 m³) (for a 5.8 bcm/a export terminal).
2002 - 2006
Norway
Myanmar-India gas pipeline
Detailed feasibility study of a 1,400 km and 36" pipeline between the offshore block A1 in the Gulf of Bengal, 60 km off the coast of Myanmar and the city of Gaya in the state of Bihar.
2006 - 2006
India
I&C renovation
Renovation of the instrumentation and control systems, and of the electrical systems for the compressor stations on the GZ1, GZ2, GZ3 pipelines between Hassi R'Mel and Arzew and GK1 between Hassi R'Mel and Skikda.
2004 - 2006
Algeria
Murgados - La Coruña LNG terminal
Complete mission for engineering, procurement, construction and commissioning including Authority Engineering for a 5.2 bcm/a import terminal, with unloading jetty, 2 LNG storage tanks (2 x 150,000 m³), a LNG truck loading station and natural gas distribution system to the local grid at 80 barg.
2003 - 2006
Spain
Conception de deux postes de gaz naturel
Conception de base pour deux postes de compression de gaz naturel pour Fluxys à Zelzate et Angleur. Raccordements au réseau existant et modification du tracé des conduites existantes près des postes. Le poste de Zelzate dispose d’une capacité de 1 000 000 Nm³ (capacité électrique installée de 32 MWe) et augmentera la capacité de transport du réseau gaz. Le poste de détente d’Angleur a une capacité de 60 000 Nm³/h et réduit la pression de 55 à 14,7 barg.
2005 - 2005
Belgium
Dahej - Hazira – Uran gas pipeline
PMC and EPCM missions including process design, basic engineering, HAZOP study, detailed engineering, procurement assistance, construction supervision, inspection & expediting, store management, commissioning assistance.
2003 - 2005
India
Terminal GNL de Sines
Conception de la construction du terminal récepteur de GNL de Transgas Atlantico à Sines, comprenant deux réservoirs de stockage de GNL à rétention totale d’une capacité de 120 000 m³ chacun, des installations de déchargement de GNL dotées notamment d’un musoir, d’une installation de déchargement et d’une passerelle pour bateaux permettant l’accès de bâtiments allant jusqu’à 165 000 m³.